Construction & Excavation (C&E) Permit Fees 

Minimum fees and deposits      C&E inspection fees        special consideration fees    miscellaneous fees

  industrial wastewater         Plan check process            Development process           REpographic fees

    

Community Development Department, Engineering Permits and Records Division

FEES EFFECTIVE JULY 1, 2009 TO JUNE 30, 2010

 

 

 

 

 

Minimum Dollar Amounts

Description

Fees

Permit

$39.00

Inspection

$73.00

Mapping (5% of inspection ) or

$10.00

Deposits

$500.00

Investigation

$73.00

Tract Billing per hour

$130.00

 

 

 

 

 

Construction and Excavation Inspection Fees

Description

Commercial

Residential

P. C. C. Curb and Gutter

$1.80

per lf

$1.30

per lf

A. C. Berm

$1.80

per lf

$1.30

per lf

P. C. C. Sidewalk (w/o base)

$0.60

per sf

$0.40

per sf

P. C. C. Sidewalk (with base)

$0.80

per sf

$0.50

per sf

Driveway Approach

$0.60

per sf

$0.40

per sf

Spandrels and Cross Gutters

$0.80

per sf

$0.60

per sf

A. C. Pavement / P. C. C. Pavement

$0.60

per sf

$0.40

per sf

Trenching <5' deep

$1.85

per lf

$1.35

per lf

Trenching >5' deep (Shoring required)

$2.20

per lf

$1.60

per lf

Connect to Existing Sewer

$175.00

each

$130.00

each

Construct Manhole

$300.00

each

$200.00

each

Construct Catch basin

$225.00

each

$200.00

each

Construct Parkway Drain

$250.00

each

$150.00

each

Construct Curb Drain

$130.00

each

$86.00

each

 

 

 

 

 

Special Considerations

Street use permit - annual

$54.00

Street use permit - single use

$26.00

Refuse Receptacle Permit Fee

$39.00

Refuse Receptacle Inspection Fee

$73.00

Refuse Receptacle Deposit

$200.00

 

 

 

 

 

Miscellaneous fees

Encroachment permit

$100.00

Street vacation - summary

$1,950.00

Street vacation - Public Hearing

$2,564.00

License Agreement for Monitoring Wells

$600.00

     each additional well

$85.00

Application for street naming

$900.00

Application for street naming change

$1,300.00

 

 

 

 

 

Industrial Wastewater Discharge

Permit Application Review

$50.00

Study Review

$150.00

 

 

 

 

 

Plan Check Process

Plan Check (New Construction) - Val < $10,000

$479.00

Plan Check (New Construction) - Val $10,001 - $20,000

$1,032.00

Plan Check (New Construction) - Val $20,001 - $100,000

$5,043.00

Plan Check (New Construction) - Val $100,001 - $250,000

$15,932.00

Plan Check (New Construction) - Val > $250,000

$16,809.00

Hydrology study checking

$1,001.00

Sewer study checking

$1,284.00

Special study checking

$1,131.00

 

 

 

 

 

Development Process

Driveway Curb Cut (residential use abutting alley)

$128.00

Certificate of Compliance (Lot line adjustment/other)

$399.00

All Covenant and Agreements and modifications thereof

$328.00

Bond or deposit reduction request

$515.00

Final Map (parcel map) checking per sheet

$241.00

Final Map (tract map) checking per sheet

$1,031.00

Tract boundary and centerline monument checking

$635.00

Subdivision Agreement time extension

$36.00

 

 

 

 

 

Reprographic fees

Price 

each additional 

Copies (BW) 8.5" x 11"

First 5 free

$0.20

Copies (BW) 11" x 17"

First 5 free

$0.20

Color prints 8.5" x 11"

$0.50

 

Color prints 11" x 17"

$0.50

 

Centerline ties and bench marks

$3.60

$1.20

Copies, non-standard plans and miscellaneous material

$1.00 per sf